Located within Englewood Schools, Bishop Elementary was the last facility to be re-built after the district’s successful school bond election. Construction was accelerated and completed in just 11 months to get students into their new building as soon as possible. The new school building holds 16 classrooms; an art room; music room; gym; science, technology, engineering and mathematics lab; maker space; and learning commons. Other noteworthy features include an outdoor classroom; accessible playground; and gathering space between the learning commons and gym.