Fransen Pittman logo

search icon close button search icon
Englewood, CO

9563 S. Kingston Court, STE 200
Englewood, CO 80112

303.783.3900 303.783.3939 (fax)
Windsor, CO

522 Main Street
Windsor, CO 80550

970.460.5250 303.783.3939 (fax)
Dallas-Fort Worth

611 S. Main Street, STE 445
Grapevine, TX 76051

214.983.2774 303.783.3939 (fax)
K-12 Education

Deer Trail PK-12 School

Project Overview

Ground-Up New Facility

Deer Trail’s BEST-funded PK-12 school was designed to obtain CHPS certification. The ground-up project encompasses a two-story structure with vocational technology classrooms and labs; athletics; commons; administration/ main entry; music suite and multi-purpose performance space; and classroom wings. The layout of the school is designed to separate primary school grade level functions from those of the secondary grades, even within shared spaces, such as the commons.

The exterior of the building is designed to blend with the existing community, utilizing materials that are both low maintenance and long lasting. Concrete block, brick and other masonry products comprise the majority of the exterior skin, with metal panel at higher elevations. The project was delivered on time and on budget.

Project Details LOCATION: Deer Trail, CO Architect: MOA Architecture Square Footage: 74,000 SF Project Role: CM/GC
previous arrow next arrow