Fransen Pittman logo

search icon close button search icon
Englewood, CO

9563 S. Kingston Court, STE 200
Englewood, CO 80112

303.783.3900 303.783.3939 (fax)
Windsor, CO

522 Main Street
Windsor, CO 80550

970.460.5250 303.783.3939 (fax)
Dallas-Fort Worth

611 S. Main Street, STE 445
Grapevine, TX 76051

214.983.2774 303.783.3939 (fax)
Commercial

DTC 5

Project Overview

Denver Tech Center Office Complex

Originally the Kodak building, this four-building contemporary office complex required innovative processes for the remodel. During the renovation, the center pod was removed and replaced with a 57 foot tall circulation tower that connected the three remaining building pods with an elevator and winding staircase. Because the site was in the core of the remaining facility, equipment access was very limited. FP creatively used a 500 ton hydraulic crane to remove exterior panels and utilized a 54 foot telescoping forklift to install the tower’s exterior curtain wall and new elevator.

Project Details LOCATION: Denver, CO Architect: Davis Parntership Square Footage: 50,000 SF Project Role: CM/GC
previous arrow next arrow