Fransen Pittman Logo

search icon close button search icon
Englewood, CO

9563 S. Kingston Court, STE 200
Englewood, CO 80112

303.783.3900 303.783.3939 (fax)
Windsor, CO

522 Main Street
Windsor, CO 80550

970.460.5250 303.783.3939 (fax)
Dallas-Fort Worth

611 S. Main Street, STE 445
Grapevine, TX 76051

214.983.2774 303.783.3939 (fax)
HomeNewsBuilding with a Greater Mission

Building with a Greater Mission

August 22, 2022
The FP team is honored to be involved in the construction of Cherry Creek School District's Mental Health Day Treatment Facility. This revolutionary project is one that places student need at the forefront and will have a positive impact on so many! Thanks for the intuitive design, MOA ARCHITECTURE. In partnership with Children’s Hospital Colorado and the CU School of Medicine’s Department of Psychiatry, Cherry Creek School District is constructing a clinical-level day treatment center to support students in grades 4-12. CCSD’s Day Treatment Center will allow more students to receive mental and behavioral health care while continuing their education. The facility will offer three levels of support (based on individual student need) and is believed to be the first district-run facility in the nation. The project requires the demolition of an existing building and the new construction of a 30,000 SF facility. Learn more about the project via the video link: https://www.youtube.com/watch?v=W1hQnLF6FC0&t=455s

Recent Articles